A work breakdown structure (WBS) for big data analytics projects — Part 2-Store
Continuing with the theme of typical big data solution pattern below, part 2 covers the storage aspects of a big data solution.
Continuing with the theme of typical big data solution pattern below, part 2 covers the storage aspects of a big data solution.
Source --> Ingest --> Store --> Process --> Analyze > ConsumeThe ingestion is covered in part 1.

Big Data Analytics Store — WBS
Link to the excel sheet